Ask not for whom the bell tolls: it tolls for thee! The construction trial (Law & Order: Hard Hat files Part 9)

This is the final section of a 9 part series discussing the entire trajectory of a construction lawsuit involving claims of design errors or omissions.  If you missed any of the earlier posts, click on the Law & Order tag to read them all.
——————————————————————————————————————–

The time has come.  You’ve been sued.  Suffered through discovery.  Talked about the project under oath til your throat turned raw.  And responded to the umpteen million request from your lawyer.  You’ve engaged experts, second-guessed your work, and looked at copies of legal documents that made your head spin.  Now, at long last, you will have your day in court.  Or will you?

church bellsWhen will your case be heard?

Your trial date is a moving target, at least in North Carolina.  Depending upon the county or jurisdiction the lawsuit is filed in, you are probably looking at your case taking from 1 year (for a small homeowner lawsuit) to 2 or 3 years for very complex cases.  This is one reason why court ordered mediation is required in all Superior Court cases in North Carolina.  It is also why most construction lawsuits do settle– at some point– prior to trial.  Some cases settle, literally, on the courthouse steps (or in the courthouse conference room).  Others settle during trial itself.  But if you find yourself settling at the last minute, you will have spent the time and money for trial preparation for naught.  A somewhat bitter pill to swallow.

What is involved in trial preparation?

Expect to review many documents relating to the project all over again with your lawyer(s), even if you’ve previously discussed them.  Expect to spend time with your expert(s) discussing your plans and design intent.  Expect to have some mock testimony sessions with your lawyers and others on their team.  Mostly, expect a lot of aggravation.  Trial preparation takes time.  A lot of time.  While much will be done by your construction lawyer, you will need to be actively involved.

How does the trial work?

The trial itself is probably the closest to a Law & Order scene that you will experience.  But don’t expect Jack McCoy (or Perry Mason) moments.  Very little happens in a trial that is completely unexpected.

If the trial is a jury trial (and most are), your lawyers will question the potential jury pool to try to weed out folks that have predisposed themselves to one side of the case.  The other side will do the same.  The result, ideally, is a group of disinterested, neutral folks that will decide your case.

After jury selection, opening statements are given.  These are speeches given by the lawyers to forecast the evidence that will be given to the jury.

The, the plaintiff (that is, the party suing you) will be told to call its first witness.  The plaintiff will proceed to call witnesses to the stand to testify.  The order that they are called in is up to their lawyers, and different lawyers have different strategies for deciding which witnesses they call first, middle, and last.

With each witness, the plaintiff’s counsel will ask open ended, non-leading direct examination questions.  After that, your counsel will ask leading questions on cross examination aimed at poking holes in the other side’s case, and establishing your own case theory.

After the plaintiff has presented its case and rests (and following some procedural motions at that point), the roles are reversed, and your lawyer will conduct direct examination, while the plaintiff will cross examine witnesses.

There are often legal sidebars during a trial, where the lawyers approach the judge and whisper about legal matters.  If extended debate on something is needed, the jury will be excused.  While you will not be invited to the bar to talk during sidebars, your lawyer can tell you what was discussed and how it effects your case.

At the conclusion of all evidence, the jury is given a set of legal jury instructions, and the lawyers present their closing arguments as to why their position should prevail.  Then, you wait.  And wait.  And wait, until the jury reaches a verdict.  The jury foreperson will read the verdict into the record.

What happens after trial?gavel

Depending on the trial results, one side may ask the judge to set aside the verdict (called a j.n.o.v.), which is rarely granted.  Whoever has lost may decide to notice an appeal of the verdict.  Appeals must be based on legal errors that the judge made during trial.  An appeal can take years, and the end result can be the same (that is, the verdict is upheld), overturned (set aside), or remanded for a new trial.  Yes, that’s right: you can be forced to re-try your case.

Is all lost, then, if you lose the jury verdict?  No; definitely not.  No one likes to spend time and money on appellate briefs.  So, even though the case is over, the parties may *still* negotiate a settlement.  Be aware, however, that you will have a judgment “on the books” against you if the jury found that way, and that can affect your credit ratings.  However, the judgment will also be rendered “satisfied” if you settle (or pay it off), which generally helps re-establish your good credit rating.

That’s it!  You now know just enough about the construction trial process to be dangerous!   I’ve obviously had to condense many details in this series, so if you have any questions or want me to expand on any area, drop me a note or comment in the comment section of the blog.

Is Your Next Project Going to Be LEED Certified? (guest post)

Happy Autumn, everyone (in the Northern Hemisphere, that is)! I hope you are finding some time to get out and enjoy the changing leaves.Today, we have a guest post on sustainable construction by Liz Nelson from WhiteFence. She is a freelance writer and blogger from Houston. Questions and comments can be sent to: [email protected].

recycling globeIs your next construction design going for LEED certification?  Even if you don’t aspire to have your project be LEED certified, the methods of developing a sustainable home can help everyone. Sustainable construction is the future in many areas of the United States and developing a home or office building that can contribute to this way of thinking could be one of your most crowning achievements. It doesn’t take much effort to develop a project that can benefit from the technologies that are available. Although the costs may increase, the value to the customer could offset those amounts.

1. Solar Arrays – On average, adding a solar array to the roof of any project could increase the value of the land by approximately $30,000. If you are building a residence for a full-sized family, it could cost you nearly $15,000 in materials to make the home 100-percent energy sustainable. This could mean that your investment of building the locale could potentially double from the installation of a solar array. Of course, these amounts are based on a global average and may increase or decrease given the area you are constructing. However, the benefits are high when building a self-sufficient system of maintaining power.

2. Tankless Water Heaters – Tankless water heaters are a superb way to reduce energy costs. As opposed to traditional water heaters, they don’t consume power or gas in order to keep the temperature of the water a specific degree. Water is heated when it is used. This greatly reduces the energy costs of a location when compared to annual costs of operating a traditional method.

3. Thermal-barrier Paint Additives – When painting the walls of your project, why not mix in additives such as Insuladd. These additives have been tested to provide an added layer of insulation to the room making heating and cooling more efficient within. The more efficient any particular area is for handling the ambient room temperature, the less energy there is used for making the area bearable by human standards. Essentially, you’ll use the air conditioner less in the summer and the heater less during the winter. Other items such as organic insulation as cotton, and perhaps hemp in the future, can make a home more efficient and sustainable as well.

4. Geothermal Heat – Some projects can be created where you can implement geothermal heat exchangers. Geothermal solutions can be implemented for a wide variety of conditions for home and office. They can be used for floor heating, ice melting, heating spas and pools and much more. Of course, installing geothermal capabilities requires prime condition of the land your project is sitting on. It may not be practical or advisable to install such a system in certain conditions such as a high water table.

There are many ways you can develop a building in order to be sustainable. In today’s market, looking at LEED requirements as a base for construction can make the project worth the investment. Many clients would be happy to pay extra if the perks of a sustainable system are great enough. Not paying the electric company a single dime could be worth an extra $30,000 to the property’s asking price to a great deal of residential and professional buyers. The next time you are planning a construction project, why not look at how you can make the development more sustainable? Even the smallest additions could peak interest in discerning or environmentally-conscious clients.

Thanks, Liz, for your thoughts.  Do you agree or disagree?  Is the typical homeowner ready to plunk down an additional $30 grand to avoid ongoing energy costs?  Share your thoughts below.

Photo (c) The Gold Guys.

 

How is that possible? State Law variations can snag you! (law note)

Today I’m guest posting over on Construction Law Musings.  My post, entitled “You Mean They Can Do That?” discusses the fact that there are different legal hurdles that can present challenges to your Architecture or Engineering Firm when you venture across state lines.

skatesAs I state in the post, just as licensing issues and building codes differ, so too do the laws.  Your best defense?  A good offense. Get help specifically tailored to the new state up front so you won’t get pinched later on.   In other words, don’t be a cheapskate!

Read the full post here.

Thoughts? Comments? Questions?  Share in the comments below.

Photo (c) Jan Andersen

 

Pull on your jeans: time for some Legal Wranglings (Law & Order: Hard Hat files Part 8)

Previously on Law & Order: Hard Hat files [chunk-chunk], we discussed how to know when a lawsuit is coming, how you will be sued, why you should not be your own attorney, and why documentation is key.  We’ve also discussed being deposed, hiring experts, and mediation.  We’re coming to the top of the 9th now, discussing how to have your case decided by a judge.  [Next up: the jury trial]. 

Your lawyer has told you that your case might be heard on legal issues alone, before a judge. Or he’s mentioned that he is filing a motion for “Summary Judgment”. What, exactly, does that mean? To understand summary judgment, it is first necessary to understand how a typical case is heard.

yada yada legal documentIn a case that goes to a jury trial, it is in fact the jury, not the judge, who decides the case. The judge handles order in the courtroom, the admissibility of evidence or witnesses, and other legal issues. But at the end of the day, the factual issues (that is, was your plan defective? If so, what if any damages did that defect cause?) are decided entirely by the jury. Most of the time.

So what’s this thing called “summary judgment”?

Sometimes, there are no real factual issues in dispute. In that case, the judge can decide the matter on the legal issues alone. For example, if you are sued after the expiration of the statute of repose, and there is no debate about when you last performed professional services on the project, then your lawyer can bring a motion to have the judge decide the case in your favor purely on that legal issue.

Most construction cases, however, are not so clear cut factually. However, you can still have a judge decide a case on summary judgment if the disputed facts, taken in the light most favorable to the other side, still show that you should win.

What happens when you file for a summary judgment hearing?

Either side can file a paper called “Motion for Summary Judgment”.  This is usually done during or after discovery, as factual issues are determined and the list of truly disputed items is narrowed.  Both sides have  an obligation to present evidence as to why/why not the judge should grant the motion.  Evidence can include affidavits (including your own and that of your expert), discovery responses, deposition testimony, and documents produced in discovery.

How does the judge decide?

The judge is required to take the factual evidence in dispute, and assume that the non-moving party’s version is correct.  For example, let’s say you are moving for summary judgment based on the statute of repose.  You claim that you last performed work more than 6 years before the lawsuit was filed.  If the other side has some evidence that work was done later than you claim, then that is a dispute of a material fact.  The judge will have to assume that the other side’s date is correct, and deny the motion for summary judgment on those grounds.

If, however, the disputed facts are not material (that is, not crucial to the deciding law), then the judge does not need to even consider them.  And no one can rely on bare assertions of fact (of the “nuh-uh” variety): they have to produce some evidence of their position.

How will we know if we won or lost?

This varies from judge to judge.  In general, unless the case is clear cut, the judge will want to take the case “under advisement”.  What that means is that the judge is going to review the presented materials, make a decision, and then call the lawyers to tell them how he/she has ruled on the motion.

What does it mean if we lose summary judgment?

If you are asking for summary judgment and lose (and in close calls, expect to lose as judges prefer that cases go to a jury), then the denial of your motion for summary judgment means that the show goes on.  Discovery can continue, and the case will be prepared for trial.

Of course, just because mediation has impassed and summary judgment has failed does not mean there *will* be a trial.  Many cases continue to be negotiated and settled “on the courthouse steps”.  Literally sometimes.

If your case does not, next week’s entry on jury trials should be required reading.

Have a question about summary judgment or other court motions?  Drop me a line or comment, below.

 

Recycling Your Construction Site: 5 Materials that Can Be Reused to Save Money (guest post)

Today’s guest post is  contributed by Madoline Hatter. Madoline is a freelance writer and blog junkie from ChangeOfAddressForm.com. You can reach her at: m.hatter12 @ gmail. com.  Read on to find out how those scraps and remainders could, in a pinch, turn into some cold hard cash.

************************************

During the construction project, there are a variety of materials that are simply tossed in the dumpster that can be re-purposed for other uses or used to enhance a last minute idea.  As you perform construction observation, take note: there could be tons of this material that can be used to save a great deal of money, if you know what you’re looking at. What recyclable materials are available on a construction site that can be reused later?

1. Wood – A lot of scrap wood is discarded during any given construction. While some of these pieces can be simply too small or odd-shaped to be of any real use, other pieces might be a perfect shape for other smaller projects. Frames, odd angle cuts, small pet doors, stairs, and a variety of other wooden uses can be created with this material that you may find yourself tossing in the dumpster. In any event, you could simply sell it by the pound to those who wish to burn or otherwise use the material which could recuperate some of the expenses of building the structure.
scrap wood
2. Drywall – Given the nature of renovations or new constructs, it is quite common place to have sections of drywall that are too small for a complete wall, but they could be used to patch holes or fit into smaller areas in other locations. As long as you can keep the drywall from experiencing moisture, it can be held for quite a long time before it is reused elsewhere.

3. Glass – If you’re planning a renovation project, keep in mind that securing the old windows can help you down the road in future projects. As long as the glass is intact, it can be cut down to fit a variety of other situations which could help save you a great deal of money on your next project. Although storing these pieces of glass may be a sensitive ordeal, the benefits could outweigh the risk as some plates of glass could be as much as $100 and up for each piece.

4. Concrete – Whether you are laying a new foundation or renovating a location, you could accumulate a great deal of wasted concrete. Although recycling concrete can help reduce the amount of waste in landfills, you can use pieces of this material to assist in other applications. Bits of concrete can be used to add stability to pipes and conduits that run underground, for example.

5. Copper – Not only does the wiring within a location contain copper, but pipes contain this metal as well. In some areas, recyclers will pay as much as $3 per pound for copper. In renovations or new developments, some of your expenses can be reimbursed by recycling copper. If you projects don’t produce a lot of waste from the metal, there is nothing that says you can’t simply save a collection of it until it becomes worthwhile to take to a recycler.

You don’t have to be a member of Green Peace in order to see the value of re-purposing or recycling materials from a construction site. There is a great deal of usefulness from these bits and pieces that can save you a great deal of money later on. The next time you walk a building site, take a look around prior to clean-up and determine what can help save money later.

Thanks Madoline for your thoughts. 

Your turn: ever recoup expenses through recycling or re-purposing construction debris?  Share in the comments, below.

 

Photo credit